Skip to content
Hercon General Construction
Back to Gallery
Outdoor Residential Featured

West Lake Pool & Patio Pour

Concrete pool deck and patio pour in West Lake, from site preparation through final finish. Formwork was set around the pool shell and the slab graded for positive drainage, then finished for a clean, slip-resistant surface.

Location

San Marcos Area, TX

Scope

Outdoor

Estimated Timeline

2-5 weeks

Material Focus

Framing lumber, deck boards, weatherproof finishes

Job Site Videos (3)

Watch the work happen — filmed on site by our crew.

Site Preparation
Finished Pour – Angle 1
Finished Pour – Angle 2

Want a similar result for your project?

Free estimate • Bonded & insured • Typical response in 1–2 business days

Free estimate • Bonded & insured • 1–2 business day response

Projects Call Now